Client: Oceania Healthcare
Construction: Generation Homes
Works Completed: Full utilities installation of power, water, fibre, and nurse call
Duration: 12 months
Stage One of the Franklin Retirement Village development by Oceania Healthcare required safe, reliable utility connections for 33 new homes and a workshop. With multiple trades onsite and tight sequencing requirements, our role was to deliver full utility installations that met both compliance standards and the long-term needs of future residents — without causing bottlenecks in the build programme.
Working in partnership with Generation Homes, we:
This project highlights the importance of precise utility installation at scale. All 33 homes and the workshop were completed to full specification, with residents gaining safe, reliable, and future-ready connections for power, water, and communications. By combining technical accuracy with strong collaboration alongside Generation Homes, Stage One was delivered seamlessly and without disruption.